Ucon
We inspect the reported leak area, adjacent details, and visible substrate to compare a localized repair with broader replacement or testing. We begin in Ucon by connecting the interior sign to the roof area above it, then record the assembly, seams, edges, penetrations, drainage, and limits on access. That evidence supports a scope the owner can evaluate before work begins.
For a commercial roof in Ucon, confirm project approvals with the owner’s design team before work that changes drainage, structure, or building use. If the roof scope changes structure, drainage, or equipment locations, the design team identifies any review or approval needed before construction. The roofing scope should describe the work clearly so the owner’s project team can confirm which local review applies. We do not treat a roof inspection as a land-use determination.
At Idaho Falls, the average May precipitation total is 1.57 inches, and Idaho Falls has 26.5 days annually when highs reach 90 degrees Fahrenheit. Current surface conditions and product limits set the work area and closure plan.



